Kitchen & Bathroom Remodeling Planning Center
Use this planning center before demolition to organize layout, budget, plumbing, electrical, cabinets, tile, waterproofing, fixtures, ventilation and project sequence.
This page is the shared planning checklist for kitchen and bathroom remodels. For deeper topic-specific advice, use the dedicated Kitchen Remodeling Guides and Bathroom Remodeling Guides.
Start With Layout, Not Finishes
Cabinet color, tile and hardware are important, but layout has a much larger impact on how the room works. Confirm appliance locations, door swings, walkways, storage, plumbing locations, vanity size, shower dimensions and clearances before selecting finishes.

For kitchens, start with our How to Plan a Kitchen Remodel Before You Buy Anything guide.
Create a Realistic Budget
A remodeling budget should include more than visible finishes. Demolition, disposal, framing repairs, subfloor work, electrical upgrades, plumbing changes, waterproofing, drywall, paint, trim, hardware, permits and labor can be a large part of the total.
- Cabinets and countertops.
- Appliances or plumbing fixtures.
- Tile and setting materials.
- Waterproofing systems.
- Lighting, switches and electrical upgrades.
- Ventilation.
- Drywall, paint and trim.
- Doors and hardware.
- Unexpected repairs behind walls or under floors.
Order Long-Lead Items Early
Cabinets, custom shower glass, specialty tile, windows, doors and certain fixtures can take weeks or months to arrive. Starting demolition before critical materials are confirmed can leave a project stalled. Build a procurement schedule before construction starts.
Kitchen Planning Priorities
- Appliance sizes and electrical requirements.
- Cabinet layout and filler requirements.
- Countertop overhangs and seating.
- Sink and dishwasher location.
- Range hood or ventilation path.
- Recessed, task and decorative lighting.
- Outlet locations and code requirements.
- Flooring transitions.
Bathroom Planning Priorities
- Shower or tub dimensions.
- Waterproofing system and drain location.
- Vanity size and plumbing rough-in.
- Toilet clearances.
- Exhaust fan sizing and duct route.
- Lighting at the vanity and shower.
- Niches, shelves and accessories.
- Tile layout before installation begins.
Waterproofing Is a System
In a shower or wet area, tile is the finish surface—not the waterproofing strategy by itself. Use a complete approved waterproofing approach and follow the current manufacturer’s instructions for seams, corners, penetrations, drains and cure times.

Do Not Treat Electrical and Ventilation as Afterthoughts
Good lighting changes how a kitchen or bathroom feels and functions. Bathrooms also need effective ventilation to manage moisture. Electrical and ventilation decisions are easiest before walls and ceilings are closed.
Plan the Construction Sequence
The exact order depends on the project, but a typical sequence includes planning and permits, demolition, structural repairs, rough plumbing and electrical, inspections, wall and floor preparation, waterproofing, drywall, tile, cabinets or vanity, countertops, fixtures, trim, paint and final punch-list work.
Choose Your Remodeling Path
- Kitchen Remodeling Guides
- Bathroom Remodeling Guides
- Kitchen Remodel Cost 2026
- Bathroom Remodel Cost 2026
- Best Shower Waterproofing Systems
- Kitchen Cabinets Buying Guide
Always confirm current local code, permit and manufacturer requirements for your specific project.